Fuse Box Installation London from £599.99

from£599.99

NICEIC & NAPIT approved · Supply & install · Part P self-certified · EICR included

Entry price

from £599.99

Duration

4–6 hours

Includes

EICR + Part P

Accreditation

NICEIC & NAPIT

Consumer unit replacement for London landlords

Many older rental properties across London still have rewirable fuse boards that lack the RCD (Residual Current Device) protection required by the 18th Edition Wiring Regulations (BS 7671:2018+A2:2022). A failed EICR that codes the consumer unit as C2 (potentially dangerous) triggers a 28-day remediation deadline — replacing the consumer unit is typically the fastest resolution.

We supply and install high-quality metal consumer units from Hager, Legrand, and Crabtree — brands trusted by electricians for their reliability and longevity. Every installation includes a full circuit test and completion EICR to confirm the work is safe and compliant.

As NICEIC approved contractors, we self-certify all installations under Part P of the Building Regulations. You receive a Building Regulations compliance certificate automatically, with no need to separately notify your local authority.

How it works

1

Book and confirm specification

Book online or call us. We confirm the number of circuits in your property and agree the consumer unit specification (split-load dual RCD or individual RCBOs).

2

Installation day (4–6 hours)

Our NICEIC approved electrician arrives, isolates the supply, removes the old board, installs and connects the new consumer unit, then tests every circuit before restoring power.

3

EICR and Part P certificate

We issue the completion EICR on the day. Your Part P Building Regulations certificate follows within a few weeks, notified to NICEIC on your behalf at no extra cost.

Fuse Box Installation Pricing

Fixed price by consumer unit type. Includes supply, installation, Part P notification, and completion EICR.

Fuse Box Installation

6 Way Consumer UnitCheapest£599.99
6–10 Way Consumer Unit£699.99
10–15 Way Consumer Unit£859.99
15–20 Way Consumer Unit£1079.99
Double Decker Consumer Unit£1149.99
Skeleton Board£979.99

Additional charges may apply: Congestion Zone +£20 · Parking restrictions +£10

What's included

  • Supply and installation of new metal consumer unit
  • Dual RCD (split-load) or individual RCBO protection
  • Full circuit isolation and reconnection
  • Testing of all circuits after installation
  • Completion EICR certificate included
  • Part P Building Regulations self-certification
  • NICEIC approved electrician
  • Installed in one day (4–6 hours)

Why older London properties need a new consumer unit

Many pre-2000s rental properties across London still have rewirable fuse boards or early consumer units that lack the RCD protection required by the 18th Edition Wiring Regulations (BS 7671:2018+A2:2022). These boards were installed when standards were less stringent and cannot be upgraded — replacement is the only compliant solution.

The problem with old fuse boards

  • Rewirable and cartridge fuse boards provide overcurrent protection only — they cannot detect earth faults or shock currents
  • No RCD protection means a fault to earth or a person contacting a live part may not be disconnected fast enough to prevent serious injury
  • The 18th Edition requires RCD protection on all socket outlets rated up to 32A in dwellings — old boards cannot be updated to meet this requirement without full replacement
  • An EICR that codes the consumer unit as C2 (potentially dangerous) triggers a 28-day remediation deadline — replacement is typically the only resolution

What RCDs and RCBOs do

An RCD (Residual Current Device) monitors the current flowing in and out of a circuit. If there is an imbalance of as little as 30mA — indicating current is flowing through a person — it trips within 40ms, fast enough to prevent a fatal shock. RCBOs (Residual Current Breakers with Overcurrent protection) provide both overcurrent and earth fault protection per individual circuit, giving maximum protection and making faults much easier to isolate without disrupting the whole property.

Part P of the Building Regulations

Consumer unit replacement is notifiable work under Part P of the Building Regulations (England). Either a Building Control notice must be submitted before work starts, or the work must be carried out by a registered competent person scheme member who can self-certify. As NICEIC approved contractors, we self-certify on your behalf — you receive a Building Regulations compliance certificate at no extra charge, automatically, without any contact with your local authority.

Frequently Asked Questions

Related services

Book your fuse box installation

Fixed price from £599.99, EICR and Part P included. Same-week appointments across all 33 London boroughs.

Book Now — from £599.99